05-14-08 Regular Session Agenda
Town Council Chambers
Begins :  7:30 p.m.

REGULAR SESSION AGENDA
PLANNING AND ZONING COMMISSION
MAY 14, 2008

1.      CALL TO ORDER

2.      APPROVAL OF MINUTES
·       Regular Session Meeting – April 9, 2008
·       Special Joint Meeting – April 23, 2008
·       Special Regular Session Meeting – April 30, 2008

3.      ZONE CHANGE APPLICATION:  Residence I (R-1) to Design Development District II (DDD-2) on a vacant 28.46 acre parcel of land with 22.79 acres to be changed from R-1 to DDD-2 located at 90 Long Hill Road (Rear) for the construction of 41 units of age-restricted residential development.
Assessor’s Map #60, Lot #39A
Applicant:  Fairway Crossing, LLC
(Postponed from April 9, 2008 Meeting)

4.      SITE PLAN APPLICATION - 90 Long Hill Road (Rear) – Construction of 41 units of age restricted residential development on 28.46 Acres
Assessor’s Map #60, Lot #39A
Applicant:  Fairway Crossing, LLC

5.      SOIL-EROSION AND SEDIMENTATION CONTROL APPLICATION – 90 Long Hill Road (Rear) – Construction of 41 units of age restricted residential development, access drive and associated storm-water drainage system on a vacant 28.46 acre parcel.
Assessor’s Map #60, Lot #39A
Applicant:  Fairway Crossing, LLC

6.      MAJOR FLOOD HAZARD DEVELOPMENT APPLICATION – Under Section 601 to allow installation of five sculptures with foundations along the riverfront walkway, a.k.a. Great River Park, located adjacent to the Connecticut River.
Assessor’s Maps #1 & 2, Lots #2 & 3
Applicant:  Riverfront Recapture, Inc. (Agent for the Town of East Hartford)

7.      SITE PLAN APPLICATION – Under Section 601 to allow installation of five sculptures with foundations along the riverfront walkway, a.k.a. Great River Park, located adjacent to the Connecticut River.
Assessor’s Maps #1 & 2, Lots #2 & 3
Applicant:  Riverfront Recapture, Inc. (Agent for the Town of East Hartford)

8.      MAJOR FLOOD HAZARD DEVELOPMENT APPLICATION – Under Section 601 to allow clearing of vegetation, installation of steel sheeting, repair of impervious layer and  repair of animal burrows on and within fifteen feet of the toe of the dike/levee system which has been mandated by the United States Army Corps of Engineers to maintain the dike/levee system in active status.
Assessor’s Maps #1, 4, 13 & 15, Lots #2, #31, #468 & 1
Applicant: Town of East Hartford

9.      SOIL-EROSION AND SEDIMENTATION CONTROL APPLICATION – Portion of East Hartford Flood Protection System – Clearing of vegetation, installation of steel sheeting, repair of impervious layer and  repair of animal burrows on and within fifteen feet of the toe of the dike/levee system which has been mandated by the United States Army Corps of Engineers to maintain the dike/levee system in active status.
Assessor’s Maps #1, 4, 13 & 15, Lots #2, #31, #468 & 1
Applicant:  Town of East Hartford

10.     SITE LOCATION APPLICATION – 28 Spencer Court – Under C.G.S. Section 8-6 and 14-54 for General Repairer’s License ownership change.
Assessors Map #14, Lot #214
Applicant:  Michael Gordon

11.     PAYMENT OF BILLS

12.     BOND RELEASES/REDUCTIONS/SETTINGS
·       400 Main St., a.k.a. Rentschler Field – Site Plan Modification Bond “Temporary Road” – Request for Bond Release
Applicant:  Rentschler Field Development Company, LLC
·       400 Main St., a.k.a. Rentschler Field – Site Plan Modification Bond – “Permanent Access Road” – Request for Bond Reduction
Applicant:  Rentschler Field Development Company, LLC
·       131 Hartland Street – Site Plan Modification Bond – “Cardinal Health” – Request for Bond Release
Applicant:  H & H Systems & Design, Inc.

13.     8-24 REFERRAL
·       Maintenance Deficiency Correction Plan for East Hartford Flood Protection
System

14.     MISCELLANEOUS

15.     ADJOURNMENT